Bathroom and kitchen renovations
The plumbing half of your renovation: rough-in, waterproofing sign off, fixture install and the final connection.
When you need this
You have a builder, or you are project managing it yourself and need the plumbing booked around tiling and cabinetry dates.
Two visits, booked around your trades
A bathroom needs us twice. Once at rough-in, before the sheeting and waterproofing go on, and once at fit off after the tiler is out. Getting the first visit wrong is what turns a four week renovation into a seven week one, because the wall has to come back off.
We set out with your tiler in the room, not from a plan emailed the night before.
Working with what is there
Perth housing stock runs from 1930s brick and tile in Fremantle to slab on ground in Canning Vale. Moving a floor waste is straightforward in one and a concrete cut in the other. We will tell you which you have before you commit to a layout.
Also on the water side
Blocked drains and CCTV inspection
We clear the blockage, then send a camera down the line so you can see exactly what caused it.
Burst pipes and leak detection
A wet patch on the lawn, a meter that never stops turning, or no pressure at all. We find it without digging up the yard.
Hot water systems
Repair, replace or upgrade. Electric, gas, heat pump or solar, sized to how many people actually live in the house.
Blocked drain, no hot water, or a smell of gas?
0481 901 901The emergency line is answered 24/7. Office bookings run Monday to Friday, 7:00am to 5:00pm.